Still trying to get used to pricing and I always think I'm massively overcharging to the point I get stressed.
Ive got to price for supply and fit of 2 toilets. The 1 is straight forward and the other is on 2" wooden block so may have to cut the plinth to make it look good remove the boxing to get to soil so I can replace the pan connector so I figure around 2 hours for 1, 3 for the other.
In total its supply and fit 2 toilets, pan connectors, New iso valves, refit and make good boxing etc travel there and back (about 30 mins each way so it is going to be best part of the day gone) Is £550 in total too much or am I just thinking too much about it.
Ive got to price for supply and fit of 2 toilets. The 1 is straight forward and the other is on 2" wooden block so may have to cut the plinth to make it look good remove the boxing to get to soil so I can replace the pan connector so I figure around 2 hours for 1, 3 for the other.
In total its supply and fit 2 toilets, pan connectors, New iso valves, refit and make good boxing etc travel there and back (about 30 mins each way so it is going to be best part of the day gone) Is £550 in total too much or am I just thinking too much about it.