Hi - I have just finished ripping out our bathroom prior to a refit. I will being getting a professional plumber in etc. to do the work required but just wondering if anyone could advise to help with the planning of the new bathroom. In the corner we have an internal soil pipe with an AAV. This was boxed in all the way to the ceiling but the pipe only runs to halfway to the ceiling at present. We would like to redesign this wall but it would involve reducing the height of the soil pipe. I do understand (well I think I do) that this needs to be higher than the level of the highest water level in the bathroom (sink or toilet). I guess my question is - how much higher does it need to be? Can I bring it down to just a few inches above the water level? Also how much clearance is needed above the AAV - can I put a ledge in just above it? As mentioned I wouldn't do anything like this myself, and would get a plumber in, but before we can get a quote for the all the work, we would like to know what are options might be. Thanks in advance.