having a light hearted debate with a mate about a job he’s on.
Renew a bath.
Existing bath is tiled down on to and it’s about 30mm lower than the panel for the new bath.
Customer doesn’t want any tiles removed.
So would you fit new bath up to the tiles and cut the panel..
Or
Fit bath at the height of the new panel against the tiles ?
 
having a light hearted debate with a mate about a job he’s on.
Renew a bath.
Existing bath is tiled down on to and it’s about 30mm lower than the panel for the new bath.
Customer doesn’t want any tiles removed.
So would you fit new bath up to the tiles and cut the panel..
Or
Fit bath at the height of the new panel against the tiles ?
I wouldn’t do either and instruct the customer that when they employed me to do the work. It would be to the best of my ability and neither option is.
 
Saw through middle of old bath to remove.

You may get the new one in but will struggle to batten.

Ideally drop out a row of tiles, install properly and infill thebgap.
 
Sometimes you have to put your foot Down As the contractor as it becomes a tossup between what Cust wants compared to a cut corners slap dash job. It boils down to communication again
 
Ha.. customer is alway rite apparently

And when the result they insisted on looks rubbish, or leaks, or whatever a year later they blame you and put photographs of *your* poor workmanship on Facebook and it's your reputation down the drain.

Don't do work that you wouldn't be happy for future customers to see because, these days, they probably will.
 
Sometimes you have to put your foot Down As the contractor as it becomes a tossup between what Cust wants compared to a cut corners slap dash job. It boils down to communication again
It’s not as if the options won’t work, the customer has been told how it should be done
Sometimes you have to put your foot Down As the contractor as it becomes a tossup between what Cust wants compared to a cut corners slap dash job. It boils down to communication again
its not really cutting corners if he wants to do it the correct way and is being told not to.
I know neither of the options are ideal but if he could get it battoned and a nice fit between the batton and tiles it should be fine.. that would be my choice out of the two options anyway
 
And when the result they insisted on looks rubbish, or leaks, or whatever a year later they blame you and put photographs of *your* poor workmanship on Facebook and it's your reputation down the drain.

Don't do work that you wouldn't be happy for future customers to see because, these days, they probably will.
I agree mate, I wouldn’t do the job either if I didn’t think I could make it decent.
I’m sure this could be made ok it’s just not ideal obviously.
 
It’s not as if the options won’t work, the customer has been told how it should be done

its not really cutting corners if he wants to do it the correct way and is being told not to.
I know neither of the options are ideal but if he could get it battoned and a nice fit between the batton and tiles it should be fine.. that would be my choice out of the two options anyway
Fine you’ve had our opinion and ignored it good luck with it
 
I haven’t ignored anything
I agree with you on how it should be done.
The question was just if you had no other choice out of the 2 what would it be.
It wasn’t supposed to get all serious or argumentative mate.
I know mate. But we have all said the same thing. We wouldn’t do either option. Please do not get cross. It isn’t worth it.
 
I have done this kind of thing. It isn't exactly fun.

In my case, I had to butt up to the sides of the existing tiles. This didn't stop me battening however. I wouldn't have done it that way out of choice, but it was how the old bath had been installed - the tiles were not cut to a level and so I had to replace like with like. This was for a friend who accepted it was a like-for-like replacement and who was due to give birth a week or so later so just needed it done quickly and isn't the type to then complain about how it looks so long as it works.

If the original bath had been tiled onto, as it should be, then I would have cut down the panel and fitted the bath to finish 2-3mm under the existing tiles. So my vote is for option 2, but bear in mind cutting a panel is not an easy job.

I have cut down plastic panels to fit under an existing bath. Then the panel had no structure and I have to build an elaborate wooden frame, curve the edges in, use velcro to make the panel removeable etc to support the panel, faff around with a block plane etc and cut carefully around surface pipework... and it took me over a day. The finished result looked excellent, but I made very little money on that at all. As I said to the customer, at least it was interesting to do, even if it did take a whole day just to do the panels, support the bath feet properly etc etc.

This was a part of the cut-down panel job in progress. Today, I would not really be happy with this, as the bath edge is still not supported by the wooden frame, but I was happy at the time.

upload_2019-1-27_12-33-45.jpeg
 

Similar plumbing topics

Size of bathroom 230cm x 210cm Height 230cm...
Replies
0
Views
644
  • Question
Much easier than that is to replace your bath...
Replies
3
Views
2K
  • Question
Take glass to glass shop, get new glass made...
Replies
3
Views
1K
  • Question
Here you go now you can see its easier 👍 kop
2
Replies
44
Views
5K
  • Question
Link
Replies
4
Views
1K
Back
Top