Hi guys. I’m on a job at the moment where the building has 100 flats over 4 floors. The problem is there’s no mechanical supervisor on site or any drawing in regards to the waste pipe work. One of the issues seems to be, there’s only 5 vents going out to atmosphere. today we’ve been told to run a float in the ceiling void on the top floor to pick up 5 flats on the top floor as well as it serving the 15 flats below. This doesn’t seem right at all. Are there any regs that prevent this or is there any guidance that should be followed? Any advice would be great. I reckon they’re are going to Durgo most of it.