Hi opinions please
replacement boiler same location as old, descending water pipes adapted to fit with 3 compression fitting each so each has 2 90 bends, short horizontal pipes and a coupler.
overall 6 fittings with 12 olives and 4 bends all above new boiler, previously straight unjointed pipe
I would never have asked for this to be done this way but do I have to accept it ?
looks to me as bit tortuous for the pumped water and has
avoidable risk of leakage.
picture attached
seal on inner wall looks off as well
replacement boiler same location as old, descending water pipes adapted to fit with 3 compression fitting each so each has 2 90 bends, short horizontal pipes and a coupler.
overall 6 fittings with 12 olives and 4 bends all above new boiler, previously straight unjointed pipe
I would never have asked for this to be done this way but do I have to accept it ?
looks to me as bit tortuous for the pumped water and has
picture attached
seal on inner wall looks off as well