Our bathroom was installed 9 months ago by what we know were tradespeople who did not have the skill or experience to do so. Several revisits to fix leaks, poor siliconing and retile whole wall and reinstall shower tray were needed and in the end we just accepted it, even though it’s clearly a bad job (and still wasn’t completely leak free).
9 months on and a gap is appearing between the floor and wall tiles. It’s only on one side of the bathroom, which is the external wall of the house. It an old Victorian terrace. They laid plywood on top of original floorboards then tiled on top of this. We also heard a loud bang in shower one day that suggests something has come loose below the shower tray.
Has anyone seen this before, know what is causing it or what they have (I assume) done incorrectly in laying the floor/tiles?
Thank you in advance for any advice.
Our bathroom was installed 9 months ago by what we know were tradespeople who did not have the skill or experience to do so. Several revisits to fix leaks, poor siliconing and retile whole wall and reinstall shower tray were needed and in the end we just accepted it, even though it’s clearly a bad job (and still wasn’t completely leak free).
9 months on and a gap is appearing between the floor and wall tiles. It’s only on one side of the bathroom, which is the external wall of the house. It an old Victorian terrace. They laid plywood on top of original floorboards then tiled on top of this. We also heard a loud bang in shower one day that suggests something has come loose below the shower tray.
Has anyone seen this before, know what is causing it or what they have (I assume) done incorrectly in laying the floor/tiles?
Thank you in advance for any advice.