Hi All
I'm planning on replacing a couple of rads soon as they are far too small for the size of the room causing the room to take an age to heat up but they are all connected via what I assume is Hep2O nothing is labled on the pipes that route behind the rad just on the flap behind the rad.
Is anyone aware of any guides for using this which is apparently the standard these days on newbuilds, it looks pretty straightforward push fit but before I drain down the system and start removing things i wouldn't mind getting a bit of how to, I can do copper but never used this stuff.
Also is there any compatibility concerns if I were to use another brand such as inserts etc the reason being I will only need to replace one length of pipe on one rad that i'll be doubling the width of and for what I believe is 10mm pipe the shortest length i can find is 25M and it's not cheap.
many thanks
I'm planning on replacing a couple of rads soon as they are far too small for the size of the room causing the room to take an age to heat up but they are all connected via what I assume is Hep2O nothing is labled on the pipes that route behind the rad just on the flap behind the rad.
Is anyone aware of any guides for using this which is apparently the standard these days on newbuilds, it looks pretty straightforward push fit but before I drain down the system and start removing things i wouldn't mind getting a bit of how to, I can do copper but never used this stuff.
Also is there any compatibility concerns if I were to use another brand such as inserts etc the reason being I will only need to replace one length of pipe on one rad that i'll be doubling the width of and for what I believe is 10mm pipe the shortest length i can find is 25M and it's not cheap.
many thanks