level
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

level

  1. Dan

    Automatic gyroscope laser level for building or plumbing

    Automatic gyroscope laser level What do you think of this for the money? .
  2. M

    Unvented discharge at high level current regs

    Hi they used to say as a last resort you could discharge the D2 pipework at high level and turn it back to the wall. Similar to a combi boiler. I have just looked back through the regs this seems to have changed and it isn't mentioned now. It now mentions if at high level it should be discharged...
  3. G

    Water level drops in pan after an hour…

    Hey Guys I’ve noticed this weekend that my en-suite toilet pan water level is seeming to regress after an hour. Toilet flushes as normal and water levels are all fine in the cistern. If I flush the toilet and wait all looks fine. However after an hour the water levels have dropped by a couple...
  4. C

    Ideal 32 system efficiency level

    I’ve had an Ideal Vogue 32max/gen2 system boiler to a Megaflo fitted a week and running it at Flow temp 73 degrees to getting a return temp of about 55 degrees C, I’m seeing the LCD screen saying the efficiency level is only 25-28%. Has anyone else seen such a low percentage? I know for a fact...
  5. realitybytes

    plumber has not fitted water supply pipes level to tiles in shower

    plumber has not fitted water supply pipes level to tiles in shower, one side is approx 5-7 mm out of line, can i fit some sort of extension to resolve?
  6. S

    New boiler to be fitted and low level UFH system

    I recently purchased the ground floor of a detached Victorian property in Dorset. As part of the refurb, I will need a new boiler and about 94m2 of low level UFH. The flooring is currently very solid floor boards.
  7. S

    Backer / Cement board for low level UFH

    Hi. We have recently bought the ground floor of a Victorian house, about 100 m2. The floors are all laid to very solid floor boards and the ceilings are 3m high. I've had some quotes from a couple of UFH firms, one says they'll lay their product directly onto the exisiting floor boards and the...
  8. A

    GAH Electrastream boiler, low pressure level, how to top up system?

    Can anyone help me identify which tap/connection it is to top up the system as the level has dropped quite a way below the red marker for the cold fill pressure on the gauge? Boiler was installed approx. 2014. I've looked in the manual & online but can't find anything. Many thanks
  9. R

    Laser level recommendation

    Just wondered which laser levels are good all rounders for accuracy, ease of use, price etc… Thanks in advance.
  10. C

    Low level shower tray - will I regret this?

    Hi all, Would welcome your thoughts on this. I'm installing a low level shower tray, over a timber floor. Cast iron soil stack only about a metre away. So far so good. The problem is that the existing 1 1/2 copper connection into the stack (previously serving bath) enters the stack at a low...
  11. M

    Water regs with NVQ level 3

    I got my water regs when I completed my NVQ level 3, in 2017. Do you have to renew this every year?
  12. D

    Level 2 plumber needing apprenticeship/voluntary work in Halifax

    Hi everyone My 20 yr old son is about to complete his C&G level 2 in May and requires an apprenticeship to go on to Level 3 and eventually Gas Safe. Is there anyone on this forum from Halifax, or nearby areas that are looking for an apprentice? If not, he could do the odd few hours or...
  13. B

    How many tasks do you have to do as part of an NVQ level 2?

    I was curious about how many tasks you lot did to pass your portfolio in NVQ level 2 P&H. Thanks.
  14. B

    How many days do you typically go onsite as an NVQ level 2 Plumber?

    I just wanted to know this before potentially starting an NVQ level 2 in Plumbing and Heating next year or so because I might find it difficult to fit the NVQ in with my non-construction-related full-time job.
  15. H

    level 2 qualified plumber looking for experience and skills

    Hello i have completed my level 2 plumbing course and looking for experience to gain in London i will work less or free just for the skill in plumbing
  16. B

    A few questions about NVQ level 2

    I want to start off by saying that I have never worked in a construction environment in my entire life, so I am very unknowledge in this area. I have only worked at a coffee shop for 5 years of my life. I am currently doing a Plumbing L2 and next year will start an NVQ L2. For the NVQ I will...
  17. S

    URGENT level 2 plumbing apprenticeship

    Hi, I am a level 2 plumbing student of London Southeast college in search of an apprenticeship. Thank you. Email: [email protected]
  18. M

    Improvised high level flush pipe.

    Hi all. I need to improvise a flush pipe some how. Anyone managed to do this with waste pipe at all. Basically the cistern is on the back of a 2 inch stud wall of where the toilet will go. The pipe cannot go straight down due to a washing machine needing to fit into the space below the...
  19. M

    Re NVQ LEVEL 2 assessment

    Evening folks. Please excuse me if this question has been asked but……. I have currently just finished my lever 2 diploma in plumbing. I was told that currently the government has scrapped NVQ’s though has, currently not replaced it with anything pending amalgamation with EAL. SO, as it...
  20. S

    Level 2 Qualified - Looking for Work / Experience - Essex / East London

    Hi, I just recently completed my Level 2 City & Guilds Plumbing Course and am now looking for bit of work / experience working alongside an experience plumber to further my knowledge, I am 33, based in Brentwood, Essex and have tools and car. I have done a few domestic jobs for friends and...
Back
Top