pohnjiper
Hi,
I have a combi boiler which is in the garage & 22mm pipes leave the boiler & rise upwards through the garage ceiling. At some point I'm guessing the 22mm pipes drop down to the ground floor. I have found the 15mm pipework that feeds 5 rads on the ground floor.
I am having some internal walls taken down & a conservatory built & want to add 3 more rads to the ground floor.
Will it be ok to T-Off from the existing 15mm pipework for the 3 new rads or should I run 22mm through the centre of the groundfloor & T-Off in 15mm to all the rads?
If I do T-Off from the existing 15mm will there be any adverse affects to the system?
I have a combi boiler which is in the garage & 22mm pipes leave the boiler & rise upwards through the garage ceiling. At some point I'm guessing the 22mm pipes drop down to the ground floor. I have found the 15mm pipework that feeds 5 rads on the ground floor.
I am having some internal walls taken down & a conservatory built & want to add 3 more rads to the ground floor.
Will it be ok to T-Off from the existing 15mm pipework for the 3 new rads or should I run 22mm through the centre of the groundfloor & T-Off in 15mm to all the rads?
If I do T-Off from the existing 15mm will there be any adverse affects to the system?