Evening guys, Currently doing a renovation on a 1920’s house. We have an existing RWP going down into a gulley at the moment which is connected to the main Sewer. This needs to be changed or run alongside a new SVP to cater for a new Ensuite bathroom.
Been trying to do some research about whether or not I can just use one SVP and drop RWP into top of it which will then act as a vent too.
Or do I need to run RWP alongside SVP and keep them separate. Opinions and answers welcome cheers
Been trying to do some research about whether or not I can just use one SVP and drop RWP into top of it which will then act as a vent too.
Or do I need to run RWP alongside SVP and keep them separate. Opinions and answers welcome cheers