- Messages
- 2,718
Last year the 2 inch copper pipe had a split in it so I cut it off and replaced it with plastic and joined it back to the 2 inch copper with a universal compression fitting.
The last part of the pipe has now split so my options are:
Cut the elbow off and extend the plastic to there - but I'll only have about 3/4 inch to connect to
Or cut off the elbow and blank it off, open a new hole with a strap and connect it with plastic.
My questions are:
How do I know if the 4inch stack laying horizontal is iron or asbestos???
What of the two options would you choose?
I'm leaning towards a strap boss and a new hole but I've got little room for a drill as this is all between floors...