M
moose_cheese
hello, I need help getting shower waste into horizontal svp. (outside of house)
The 50mm shower waste (red circle) exits the building above the horizontal svp pipe (blue). This 'red' shower waste has already traveled 2.3m at the correct fall before it exits the building.
Which option of pipe work (green) can i use to connect? A, B, or C?
H1 says '45 degree join', but I also cant go over the maximum fall... it's only 300mm ish.
(thought about putting this in the Marley 135deg boss branch SWS4135)
Thanks
MC
The 50mm shower waste (red circle) exits the building above the horizontal svp pipe (blue). This 'red' shower waste has already traveled 2.3m at the correct fall before it exits the building.
Which option of pipe work (green) can i use to connect? A, B, or C?
H1 says '45 degree join', but I also cant go over the maximum fall... it's only 300mm ish.
(thought about putting this in the Marley 135deg boss branch SWS4135)
Thanks
MC