Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss 87 degree bend direct into soil stack? in the Boilers area at Plumbers Forums

Status
Not open for further replies.
J

jonjack

Hi there

pipe.scenario.jpg

I'm running a new soil line into a stack and have a situation shown in the photo whereby I have a 87 degree bend joining up straight into the stack.

Notes:
- yes, this will all be buried below ground level (hence its brown)
- I will be replacing the (brown) vertical section above ground shown in the photo with black pipe
- I will likely have a couple of inches of straight soil pipe between the couplings shown in the photo or I will use a single connector bend straight into the 3-way

My question is - is it ok to have a bend so close to the stack?
I don't see why not but I wanted to check since this is my first time at groundworks.

cheers
 
Last edited by a moderator:
always bear in mind how your going to rod through a blockage, include rodding eye where needed
 
cant u tea it in the ground with a y bend. brown black gray doesnt matter what it is if its beeing boxed
 
if not just make sure u got a decent fall then everything will go round the bend
 
Thanks for the replies.

I cant tee on ground unfortunately so will ensure there is a decent fall.
I will have rodding access on new horizontal line as well as vertical stack.

Kel4783 - do you propose the horizontal soil line feeding into the bend has a fall of maybe 1:30 then rather than about 1:40?

ie. about 30mm drop per meter?

cheers
 
Last edited by a moderator:
Thanks for the replies.

I cant tee on ground unfortunately so will ensure there is a decent fall.
I will have rodding access on new horizontal line as well as vertical stack.

Kel4783 - do you propose the horizontal soil line feeding into the bend has a fall of maybe 1:30 then rather than about 1:40?

ie. about 30mm drop per meter?

cheers
Hi sorry for late reply yeah either will be ok i've donne em with 1:10 and they've been fine. some times u have no choice with out going in to great expence.
 
Cheers Kel - I have more confidence in what I'm doing now after these comments.
 
Status
Not open for further replies.

Similar plumbing topics

Yes it’s doable but I suspect it wouldn’t be...
Replies
1
Views
345
hi from Croatia One crazy plumber make many...
Replies
0
Views
813
Thanks, I think its a case of stick with the...
Replies
4
Views
876
Should have added in, naturally there will be...
Replies
3
Views
1K
Yes sorry :D noticed I missed liquid off
Replies
9
Views
1K
Back
Top