Hi All,
Thanks for your time.
Planning a complete house refurb, where the utility/WC/bathrooms sit right next to the riser which will take the primary up to the cylinder in the loft. It would be easiest to take these towel rads off this primary. All the other rads are on the opposite side of the house, off a different, existing riser.
Does this schematic work? What else would it require in terms of NR valves etc?
The idea is to have the towel rads come on when either the DHW comes on, or the heating generally, controlled by TRVs. One would be a bypass if necessary, probably the utility.
Thanks for your time.
Planning a complete house refurb, where the utility/WC/bathrooms sit right next to the riser which will take the primary up to the cylinder in the loft. It would be easiest to take these towel rads off this primary. All the other rads are on the opposite side of the house, off a different, existing riser.
Does this schematic work? What else would it require in terms of NR valves etc?
The idea is to have the towel rads come on when either the DHW comes on, or the heating generally, controlled by TRVs. One would be a bypass if necessary, probably the utility.