im currently working on a house - a lot of plumbing, kitchen and bathroom. now the bathroom ive lifted the floor boards today to have a look at the wastes and the 1" and a quarter and inch and a half from the basin and shower respectively are notched into joists trhough every single one... so there is 2 2" notches 4 inches apart from each other in each joist going through bathroom - also the waste for shower, is notched half way down joist as the previous shower tray sat straight onto joists and landed half on half off a joist....
also basin waste went along joists and 45 down and back up under 2 15 mm heating pipes and continued on its run
either a diyer or a plumber who didnt give a flip done this.
now im wondering what can be done to joists ? maybe add some strength to them apart from ripping out and ideas ? or is it something the structural engineer would have to look at? or would you just crack on and install the new bathroom ?
also basin waste went along joists and 45 down and back up under 2 15 mm heating pipes and continued on its run
either a diyer or a plumber who didnt give a flip done this.
now im wondering what can be done to joists ? maybe add some strength to them apart from ripping out and ideas ? or is it something the structural engineer would have to look at? or would you just crack on and install the new bathroom ?