Hi guys,
Sorry to have to ask this one, especially when I have done it previously on a number of occasions. But, is it okay to simply tap into existing feed and return circuits on heating system for the additional radiator?
I know that the boiler is capable of coping with the extra demand, and previously I have Teed off the existing pipework and fitted a stop valve, allowing me to fit my new pipework and radiator without disturbing the existing systems operation.
Thanks for your help.
Steve