P
paul78
hi ive a combi system with 7 rads off it, im looking to add another rad and need advice on the process.......
turn stopcock and combi off, attatch hose to lowest rad which has drain off, start empting and bleeding rads to assist, once empty tee into nearest flow/return and run new pipework to new rad, add inhibitor to upstairs rad, start refilling checking boiler pressure and keep bleeding all rads til full and make sure boiler is 1.5 bar.
hope this makes sense....
turn stopcock and combi off, attatch hose to lowest rad which has drain off, start empting and bleeding rads to assist, once empty tee into nearest flow/return and run new pipework to new rad, add inhibitor to upstairs rad, start refilling checking boiler pressure and keep bleeding all rads til full and make sure boiler is 1.5 bar.
hope this makes sense....