hi everyone, im a diyer in need of some advice. the job i need doing is to fit a new basin and bath. the system i think is a vented one where i have a header tank and a storage tank with immersion.
on the sysyem i have a rayburn with a drain on it. my question is can i turn rayburn off run the hot water until cold, isolate header tank feed and drain at the lowest point which is on rayburn?
have i got this right or totally wrong end of the stick?
also advice on filling the system please!
on the sysyem i have a rayburn with a drain on it. my question is can i turn rayburn off run the hot water until cold, isolate header tank feed and drain at the lowest point which is on rayburn?
have i got this right or totally wrong end of the stick?
also advice on filling the system please!