1933 house garage.... clay pipe .... toilet removed 25 years ago and pipe blocked and concreted over......
So... im trying to install a new toilet.... took ages chipping away the concrete (had no idead where the soil pipe was)
Only to reveal that the side has lost a chunk when the old toilet was removed..... no i didnt just do it lol
Right... i know the correct thing to do would be to dig up the whole concrete floor and install a new pipe....
But, im getting on a bit.... and cant be doing with it.....
So, my potential solutions for your kind comments / advice are....
1. Chip.. grind about 40mm off the top of the undamaged section .. then install a push in pan extension pipe. Cement the floor and cut off pipe level with floor.... then use a flexible pan connector into that pipe....
2. Use some waterproof concrete into the hole in front of the soil pipe to form a new 4" hole level with the floor. Then use a flexible pan connector....
Any i deas / suggestions / advice would be very gratefully received......... Many thanks
Photos below
View attachment IMG_09052020_094403_(1000_x_750_pixel).jpg
View attachment IMG_09052020_094300_(1000_x_750_pixel).jpg
In a follow on from a previous post....
1933 house garage.... clay pipe .... toilet removed 25 years ago and pipe blocked and concreted over......
So... im trying to install a new toilet.... took ages chipping away the concrete (had no idead where the soil pipe was)
Only to reveal that the side has lost a chunk when the old toilet was removed..... no i didnt just do it lol
Right... i know the correct thing to do would be to dig up the whole concrete floor and install a new pipe....
But, im getting on a bit.... and cant be doing with it.....
So, my potential solutions for your kind comments / advice are....
1. Chip.. grind about 40mm off the top of the undamaged section .. then install a push in pan extension pipe. Cement the floor and cut off pipe level with floor.... then use a flexible pan connector into that pipe....
2. Use some waterproof concrete into the hole in front of the soil pipe to form a new 4" hole level with the floor. Then use a flexible pan connector....
Any i deas / suggestions / advice would be very gratefully received......... Many thanks