Hi guys
I'm after some advice in regards to a cylinder I have been asked to install for a customer.
I have been asked to install the below cylinder to an open vented system (gravity fed)
Range Tribune HE Solar TT180PT4 180l Unvented Indirect Pre-Plumbed Solar Twin-Coil Twin-Zone Hot-Water Cylinder
I've looked at MF insructions and it clearly says this can be done, however its something i havnt done before, however I do hold unvented cert, before anyone asks
My customer doesn't have solar fitted yet, but in a few months time he will have the panels fitted, so the second coil will be just capped until this time.
Ok so my questions are,
I'm assuming the F&E tank and cold water storage tank will now be made redundant,
Does anyone have experience of doing here and if so would you be able to talk me through the best way of going about this.
cheers in advance
Mav
I'm after some advice in regards to a cylinder I have been asked to install for a customer.
I have been asked to install the below cylinder to an open vented system (gravity fed)
Range Tribune HE Solar TT180PT4 180l Unvented Indirect Pre-Plumbed Solar Twin-Coil Twin-Zone Hot-Water Cylinder
I've looked at MF insructions and it clearly says this can be done, however its something i havnt done before, however I do hold unvented cert, before anyone asks
My customer doesn't have solar fitted yet, but in a few months time he will have the panels fitted, so the second coil will be just capped until this time.
Ok so my questions are,
I'm assuming the F&E tank and cold water storage tank will now be made redundant,
Does anyone have experience of doing here and if so would you be able to talk me through the best way of going about this.
cheers in advance
Mav