Bathroom is 1.92 x 1.90 x 2.3H
I will remove old tiling, wallpaper and clean walls. Builder will remove flooring.
I will supply bath, bath tap, radiator, bog roll holder, bath waste, shower, basin, pedastal, wall fixings, tap, waste.
Disconnect bath, basin and WC. No scrappage.
Builder to supply shower rail, wood bath panel and fit.
Builder to supply WC, flooring, underlay, skirting, wall tiles and fit. Fit bath, basin and WC.
Remove fake plasterboard wall (70cm wide x 2.3MH) shorten or replace for the new longer bath. Replace small 30cm x 30cm piece which is rotten (next to bath)
Wood door and frame (builder to supply)
Fit radiator. Builder to supply valves. Fot bog roll holder.
Tiling to ceiling. Remove door, bath panel and window from tile coverage
Fit pull cord switch.
Builder to supply consumable items such as tile adhesive, grout, glue, nails, general piping, etc etc to complete the job.
I will remove old tiling, wallpaper and clean walls. Builder will remove flooring.
I will supply bath, bath tap, radiator, bog roll holder, bath waste, shower, basin, pedastal, wall fixings, tap, waste.
Disconnect bath, basin and WC. No scrappage.
Builder to supply shower rail, wood bath panel and fit.
Builder to supply WC, flooring, underlay, skirting, wall tiles and fit. Fit bath, basin and WC.
Remove fake plasterboard wall (70cm wide x 2.3MH) shorten or replace for the new longer bath. Replace small 30cm x 30cm piece which is rotten (next to bath)
Wood door and frame (builder to supply)
Fit radiator. Builder to supply valves. Fot bog roll holder.
Tiling to ceiling. Remove door, bath panel and window from tile coverage
Fit pull cord switch.
Builder to supply consumable items such as tile adhesive, grout, glue, nails, general piping, etc etc to complete the job.