- Messages
- 12
Ok lads, any advice is much appreciated, went to a large 4 storey house today 4 bathrooms. Large bathroom 2nd floor backs onto boiler room with unvented in there. Bathroom has Hudson reed shower 4 body jets n shower head, from floor jet 1 good , jet 2 okay-ish ,jet 3 poor ,jet 4 a dribble shower head pitiful, 2.5 bar pressure incoming, was thinking of teeing into hot at furthest draw off point and pumped return back to cylinder with non return check valve , custard has had several diff lads in to sort it but to no avail, any ideas , thoughts or advice