joe brown
A friend of mine at college managed to get a plumbers mate job. He said that during the week they fitted a bathroom. He said they ripped a bathroom out and installed a new suite. They left the floor because the owner wanted a wet room type floor. They did however tile around the bath and sink about 2ft high. He said the customer supplied the materials and suite and they qouted and recieved £2000 for the job.
Is this the going rate as i thought it would be much less than this. I was thinking more of £300. He also said it would take 3-4 days and i was thinking more of a day 2 at the most. The fit was done in manchester.
Is this the going rate as i thought it would be much less than this. I was thinking more of £300. He also said it would take 3-4 days and i was thinking more of a day 2 at the most. The fit was done in manchester.