Just started gound work on self build bungalow and wondering best way to do below ground soil pipes.
For toilet I was going to go straight down through slab and out through deadwork into a manhole. I will work out falls from manhole and set the height of the waste water system as required.
For sinks/baths/shower etc I was going to use 40/50mm through the slab/deadwork into a back inlet gulley trap -> manhole -> grease trap -> waste water. Wondering is the height of these pipes critical or is it adjustable.
I've attached a plan for reference.
For toilet I was going to go straight down through slab and out through deadwork into a manhole. I will work out falls from manhole and set the height of the waste water system as required.
For sinks/baths/shower etc I was going to use 40/50mm through the slab/deadwork into a back inlet gulley trap -> manhole -> grease trap -> waste water. Wondering is the height of these pipes critical or is it adjustable.
I've attached a plan for reference.