phil hair
Gas Engineer
- Messages
- 42
sorry to ask the same old questions again. Im due to replace an icos 15 he and im looking for your valued opinion.
I fit a lot of logic plus combi's , but the heat only requires a wire to the pump from boiler (for the pump over run)
I think i read somewhere that this is not required anymore, does anybody know if this is true?
Otherwise, what would you put in? It is for a landlord, so price is always an option.
thanks.............
I fit a lot of logic plus combi's , but the heat only requires a wire to the pump from boiler (for the pump over run)
I think i read somewhere that this is not required anymore, does anybody know if this is true?
Otherwise, what would you put in? It is for a landlord, so price is always an option.
thanks.............