hi guys, has anyone got any time saving tips for replacing a rad and valves on combi system
 
nothing more than dropping the pressure and working on one pipe at a time. cant really do anymore than that
 
easyer on a rad upstairs, blow off the pressure on the prv on the boiler, turn off the rad valves on both sides, drain the rad into a thick binliner/use a wet vac to suck it up under the union. undo the bottom nut Be brave snatch it, shoot dirty water up the curtain etc, putt your thumb over the open pipe until it makes a circular cut into the skin of your thumb and bleeds, take a few deep breaths, put on the new valve shooting more black gunk up the laura ashley wallpaper and making sure the biege carpet gets wet around the valve, tighten, refill the rad.
Btw gas leak detection fluid in a pressurised can makes excellent carpet stain remover, not the luminous pink/green stuff though.
 
blow off the pressure on the prv on the boiler, QUOTE]

Not good to release pressure through prv as 70 % of time will not re seal,end up having to fit new head or complete valve :(
Alot of plumbers try to rush draining,to get on with job,but what do you save on an average system 10-15 mins,which is lost cleaning up afterwards,like carpet ;)
If I have to drain a system,thats the first thing I do,tools on job and drain,then when draining,get rad,valves any fittings,unpack,tape up threads by that time draining nearly done,if not done

If not open prv,ect :D
 
Last edited by a moderator:
Not good to release pressure through prv as 70 % of time will not re seal,end up having to fit new head or complete valve :(

Yeah fair play to you Puddle ,this happened last time I did this when I changed the pump on a 7yr old WB combi when I changed the pump, I spent over an hour trying to sort it at 7pm on a friday.
I will be more likely to try blowing off the prv as a "pro" as Ive got more of a chance of sorting it if it goes wrong.
The rest of my post was more light hearted.:D
 
Status
Not open for further replies.

Similar plumbing topics

Hi Thanks for posting your question. If...
Replies
1
Views
379
Thanks a lot, put lots more turns on + some...
Replies
6
Views
999
N
  • Question
Hey DIY enthusiasts, Just wrapped up a drain...
Replies
0
Views
501
Nasir Ahamed
N
Hi All This is following on from thread I...
Replies
0
Views
633
Thanks for the reply, I followed your advice...
Replies
2
Views
1K
Back
Top