M
Ms M
Hi guys and gals.<br><br>This is my very first post on here and I hope you can help. Sorry in advance for the length of this post!<br><br>I've had the bathroom renovated and the lounge and kitchen are now being done. The guys (two) have been finishing the plastering after first fix electrics. The boiler which was faulty and fixed about two weeks ago was not covered up during the channelling out by the electrician or when they did the plastering so I'm a bit concerned.<br><br>Also they have not fully plastered all the walls at the bottom or around the gas and electric meters and pipes as they ran out of plaster! They said that the units will hide it. I am not happy and I offered to pay for more plaster. They have started to assemble the units and left early after setting up a dehumidifier to dry the plaster.<br><br>When I queried things before they have said I am being picky and that it will all come together at the end and look good but if keep complaining they can stop the job and I can pay them for the work done so far. I feel like I'm between a rock and a hard place.<br><br>I have waited a long time for the renovations and using up most of my savings. Am I expecting too much and should I just leave them to it as they are the experienced ones? <br>