safetyman
I've come across a couple of instances in External Wall Insulation where the operatives believe that it is OK for a boiler flue terminal to be removed from the wall but allowing the boiler to continue working whilst they install external wall insulation onto a building, but they leave a space of 300mm around the flue pipe hole (therefore not obstructing the flue pipe). They have in one instance removed the flue terminal off the outside of the wall but believe it OK to do so if they leave that 300mm gap around the hole (note - only the terminal was removed, and no part of the pipework was otherwise touched.
I've tried finding definitive guidance on this, but can not find any.
Does anyone have any ideas? I need to write a robust policy on this but it needs to be backed up by clear external guidance.........