Hi all
i would really like some advice please
2 zone heating 1 upstairs 1 downstairs on an ideal combi boiler
2 Honeywell cm707 programmable stats one for each valve
wired to Honeywell junction box(wiring centre) as follows
perm live from fused spur to term 1
perm live from term 1 to boiler
perm live to both stats in term 1
perm live (grey) to both valves in term 1
All neutrals in term 2
all earths in term 3
the stats have the perm live going in term A with the
return term B out of stat (black) going to wiring centre in with brown upto valves
orange from valve back to wiring centre with a grey going to boiler s/l
each black from stat go into a separate terminal 4 and 6 with a brown from the valve
when the stat is pumped up for heat the valves open but boiler does not fire is the wiring correct
the valves are Drayton any help much appreciated thanks
i would really like some advice please
2 zone heating 1 upstairs 1 downstairs on an ideal combi boiler
2 Honeywell cm707 programmable stats one for each valve
wired to Honeywell junction box(wiring centre) as follows
perm live from fused spur to term 1
perm live from term 1 to boiler
perm live to both stats in term 1
perm live (grey) to both valves in term 1
All neutrals in term 2
all earths in term 3
the stats have the perm live going in term A with the
return term B out of stat (black) going to wiring centre in with brown upto valves
orange from valve back to wiring centre with a grey going to boiler s/l
each black from stat go into a separate terminal 4 and 6 with a brown from the valve
when the stat is pumped up for heat the valves open but boiler does not fire is the wiring correct
the valves are Drayton any help much appreciated thanks