- Messages
- 5,433
So pipes drop down from above and feed and return join rad at the top right and top left. Bottom left and right just have blanks.
I'm thinking only problem would be bleeding. So then fit an auto-bleed up in the loft.
Just would look so much neater for two chrome pipes to run down and join the rad rather than come down and across and up and again. This is being fitted on wall that's already finished and tiled.
I'm thinking only problem would be bleeding. So then fit an auto-bleed up in the loft.
Just would look so much neater for two chrome pipes to run down and join the rad rather than come down and across and up and again. This is being fitted on wall that's already finished and tiled.