B

Bunker

F&E tank, big house, full of slime, vent capped off. Why would someone do that? Boiler wired up weird too, on HW, tank stat opens 2PV but doesn't turn boiler on, valve only wired to the stat.
Any logic in this? Cable runs are easy, boiler directly below cylinder.
Cheers
 
Would be very concerned if the open vent is capped off. Probably piped up wrong so it pumps over. As you have already hinted on, the DHW stat and zone valve should be interlocked with the boiler.
 
Pumping over .
is the feed 22mm?

if so they might have decided it would be fine as combined feed and vent.

as for the wiring..... Idiots
 
maybe the system was orignally solid fuel? hence the stat to 2port wiring?
 
Nope if sold fuel grav 28 onto cyl no 2 ports. Sounds like a good old DIY job!
 
I decided I would try and work out a re-wire but got very confused....turns out the cylinder stat does interlock with the HW pump but not the boiler. There are 2 heating zones each with a pump and a 2PV. No air stats anywhere (tpv's on each rad though).
I tried to explain to the custard why it was inefficient but found myself babbling incoherently.
 
Status
Not open for further replies.

Similar plumbing topics

  • Question
Hi Hi if you have a expansion pipe if must...
Replies
15
Views
2K
  • Question
Red circles show my new AAVs and the manual...
Replies
17
Views
2K
  • Question
Get a roofer to replace a ridge tile and you...
Replies
1
Views
964
N
Is it a s plan system..ie 2 motorised...
Replies
2
Views
731
Bypassboy
B
Back
Top