S
Surfjayce
ok so heres the layout, 3 storey building comprising of a shop (ground floor) and 2 storey maisonette above, the cast iron waste goes through the lot but is only for the maisonette. i need to install a basin on the 1st floor and a shower, basin and toilet on the second floor. 2 options as far as i can see, 1, buy a cutting tool and all that jazz to install boss's and straps (i dont like) this option, 2, take the cast iron pipe down to about havle a foot into the 1st floor toilet and re do in plastic (this is the option i like)
so thats the situation and heres my questions, how easy or hard are either option and if i go with option 2 how does the cast pipe dismantle from the roof vent? is it a simple slide off slide on jobby or am i going to have to replace the vent also? (i dont really fancy getting on the roof to be honest)
so thats the situation and heres my questions, how easy or hard are either option and if i go with option 2 how does the cast pipe dismantle from the roof vent? is it a simple slide off slide on jobby or am i going to have to replace the vent also? (i dont really fancy getting on the roof to be honest)