Leoki
I need to extend the flow and return pipe from the main house heating into a new conservatory/extension at the back of the house. I plan to come off the existing 15mm copper pipework into 15mm Hepworth. The level of the floor in the extension needs to be made up, 100mm kingspan and then 100mm of screed on top and tiled to finnish. The pipework will be covered by the screed. Should i look to put the 15mm into another pipe to protect it or should it be okay if it is just covered by the screed ?