Curently have a vented system with 10mm pipework.
Thinking of making the most of the boiler scrappage amd changing to an unvented system.
I'm also thinking of doing a kitchen extension in the next 6-12 months and digging up the floor and installing underfloor heating in the whole of the kitchen.
Also an additional downstairs shower in the extension.
Is there any additional work which I should get done when installing the boiler which is easier done now rather than at a later date?