Hi I'm thinking/ wanting to change
From a Vented to pressurised
I understand a few basics ( CW tank goes + Cylinder, Pump,gate valve goes
Replaced by a mega flow or similar ) the boilers in kitchen and cylinder in bathroom ( directly above Boiler on 1st floor ) I'd like to move everything into the loft
1 is there a huge amount of pipe work that needs changing ?
I know I need a gas supply to go up and upgrading of the cold water supply into the loft I've done a check on the pressure it's just under 4 bar as it is ( I will upgrade if necessary though ) I've got more to ask ( sorry )
I'm guessing / hoping there's a few q,s I need to explain
Cheers
Ps I've a good route for any additional pipe work to go up where the existing is now
From a Vented to pressurised
I understand a few basics ( CW tank goes + Cylinder, Pump,gate valve goes
Replaced by a mega flow or similar ) the boilers in kitchen and cylinder in bathroom ( directly above Boiler on 1st floor ) I'd like to move everything into the loft
1 is there a huge amount of pipe work that needs changing ?
I know I need a gas supply to go up and upgrading of the cold water supply into the loft I've done a check on the pressure it's just under 4 bar as it is ( I will upgrade if necessary though ) I've got more to ask ( sorry )
I'm guessing / hoping there's a few q,s I need to explain
Cheers
Ps I've a good route for any additional pipe work to go up where the existing is now