channelling pipework in walls connecting to a central valve head | Gaining Plumbing Experience | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss channelling pipework in walls connecting to a central valve head in the Gaining Plumbing Experience area at Plumbers Forums

G

gibbi

Hi all,

I've purchased 3 x vertical rads (H:1800mm x 600mm). I couldn't stand looking at the surface mounted pipes running from ceiling to floor, so I decided to bury the pipework into the walls.
I was advised to channel out a chase around 20/25mm in the wall, which I have done, this chase runs down the centre of where the radiator will be sited.
I was told to cover the pipes with celafelt 15mm/22mm pipe lagging and to hold them in place with a flattened piece of copper nailed into the block wall
I noticed that when I connected the central valve set to the rad, that the pipe tails (only 15mm in length), have to be exactly 50mm centre to centre and in line with the central valve.
I'm concerned that when the plasterer covers the pipework, and I replace the rad, that the pipe tails might move, even if it's only a fraction, they then won't line up with the central valve.
Would it be a better solution, to just cover the pipe runs with celafelt lagging and then cover the pipes, with PVC channel and leave the tails clear so at least there will be some movement when the plaster has dried? One problem is that the two 15mm pipe side by side (when connected to the central valve), are 75mm, is there an 80mm PVC channel?

Any thoughts or ideas would be appreciated. I will obviously sort something out over time but any short-cuts would be great

Regards

George
 
Get a small piece of wood ( ply MDF pine ) drill two 15 mm holes at the centres you require and slip over the pipe ends.
This will hold the centres you need. Sometimes you can even screw th wood to the scerting board to keep your levels. Excuse my spelling.
 

Similar plumbing topics

Ok I think I see what your saying mate, So...
Replies
9
Views
725
Yes I’d do that too, just shut the radiator...
Replies
5
Views
778
You’re 200 miles away - he is there. You’re...
Replies
3
Views
586
Replies
0
Views
446
M
As above, flush and test before even thinking...
Replies
2
Views
576
Back
Top