just been to price a job, indirect 900x450 cylinder.
the cylinder is in a tight space behind all pipe work and pumps etc, and maybee the door frame will have to be knocked about if stripping the lagging of dont work.
thought to myself do as normall including extra labour just to get the job as its been thin on the ground lately and for the last 2 weeks not been paid for any work😡.
£375 all in luv.
the reply was, oh thats all right then. i have been quoted £250 from someone who has just started out on his own, thanks anyway.😱😡.
its bad enough beeing under-cut by 50% let alone wasting my time and fuel.
anyone else experiencing this at the moment or do i need to find the nearest tree and a hemp rope?.😕
just been to price a job, indirect 900x450 cylinder.
the cylinder is in a tight space behind all pipe work and pumps etc, and maybee the door frame will have to be knocked about if stripping the lagging of dont work.
thought to myself do as normall including extra labour just to get the job as its been thin on the ground lately and for the last 2 weeks not been paid for any work😡.
£375 all in luv.
the reply was, oh thats all right then. i have been quoted £250 from someone who has just started out on his own, thanks anyway.😱😡.
its bad enough beeing under-cut by 50% let alone wasting my time and fuel.
anyone else experiencing this at the moment or do i need to find the nearest tree and a hemp rope?.😕