Commercial high pressure system, will hep couplings be stong enought? | Commercial and Industrial Plumbing Forum | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Commercial high pressure system, will hep couplings be stong enought? in the Commercial and Industrial Plumbing Forum area at Plumbers Forums

Illuminate

illuminate
Messages
75
I am having to work on a concealed shower but there is no service valve and so I am having to isolate from a large mixing valve which is linked to several other showers. I am going to add a service valve to make it easier for future maintenance but the pipe connected to the shower is 15mm plastic and I have a compression service valve. I don't like using compression on plastic and so am planning to put the service valve onto copper and have a hep coupling on each end to just fix it onto the plastic pipe but I was worried that the high pressure system with a very large pump would cause the hep coupling to burst. Please can anyone enlighten me and give me the reassurance I need?
 
If there’s a blending valve probably Mira no point in putting a shower in best to stick with existing probably push / time accessories with fixed heads

There should be valves before the blending valve
 
If there’s a blending valve probably Mira no point in putting a shower in best to stick with existing probably push / time accessories with fixed heads

There should be valves before the blending valve
Thanks foe your reply, I did not explain correctly, I am keeping existing lush button but I need to change the push button itself. Strangely, there is no isolation before the mixing valve, I looked really well, following pipe route and I went further along the other side of mixing valve on both hot and cold pipes. Unusual that the original plumber hadn't added this.

Even though the water would be much below 95 degrees after being mixed, I'd rather not risk it like what you are hinting as I would be worried in the event of the mixing valve failing.

A lot of the other pipe routes to the other showers have compression ball valve isolations but like I said, I had compressing onto plastic, though it is a swimming pool area and so the main damage is a leak would be the cheap office style ceiling (whatever you call it) abd it would only weap from a compression at worst. But probably best foe me to just leave as it is and again isolate the mixing valve when they are closed.

Any further tips would be appreciated, appologies to go on.
 
https://www.NoLinkingToThis/p/hep2o-hx22-15ws-ball-valve-15mm/1375f
 
I agree, you’re way over thinking this.

Cut pipe, add two inserts, install compression lever valve. And if possible clip the pipe either side of the valve.

Transitioning to copper just adds 2 more potential leak joints.

I can’t remember the last time I’ve seen a compression on plastic leaking, however, compression on copper? A couple of hours ago.

The olive compresses the plastic pipe and creates a great seal.
 

Similar plumbing topics

  • Question
Many thanks for the reply @Timmy D thats a...
Replies
5
Views
902
  • Question
1 is filling loop passing. 2 if it’s a combi...
Replies
1
Views
496
  • Question
I would suggest getting a G3 plumber in to...
Replies
9
Views
414
Standard cistern fed or mains fed ?
Replies
1
Views
744
  • Question
Take flow readings where ever you can. Just...
Replies
14
Views
855
Back
Top