- Messages
- 928
I just wanted to know as I'm not 100% sure but I've been to quote up a job which was initially a big fish and chips but over the years has been downsized and the new owners wish to convert the building into 3 seperate holiday lets all going to be run off communal heating/hot water (combi ). Currently there is a monstrous u40 meter... Can I still work on that meter without having a commercial ticket as the pipework/purge volumes won't be exceeded for new boiler? Or isit best to get gas board to downsize meter?