Commission Checklist, dishonest installer, the Gas Safe Register | Gas Engineers Forum | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Commission Checklist, dishonest installer, the Gas Safe Register in the Gas Engineers Forum area at Plumbers Forums

Messages
17
Just browsing the threads and this one here // www .plumbersforums. net /threads /bldg-regs-compliance-interlock.103043/ caught my eye.

1. If a GS registered installer installs a new boiler that does not meet the standards of the Commissioning Checklist, but signs it off anyway, what is to be done?
The original installer being either dishonest or incompetent cannot be relied upon to remedy the problem or the customer has lost faith in them.
a) Must the original engineer remedy the problem?
b) Can different GS registered engineer remedy the fault?
c) The GSR only allows for the original engineer to remedy defects highlighted in the Inspection report, if the customer has lost faith in their competence, what options are available to the customer?

2. The thread above says that an installation was found to be defective following a GS Inspection: " the GS inspector's report also highlighted some building regs contraventions which were not directly within the Gas Safe remit. These include ...... benchmark only part completed ..."
a) Defecting an installation due to BR contraventions - does anyone have any experience of this still happening?
GSR have indicated that this falls outside of their remit, any thought, please?
b) What should happen if the Commissioning Checklist is filled in incorrectly - specifically the last section on "ALL INSTALLATIONS"

The GSR are not interested in the Benchmark process and have no remit. That being so, under whose remit does it fall under? If there is no answer to the question, what's the point of having it other than as simply a checklist for the installer but that it can't be relied upon by the customer?

Cheers
 

Similar plumbing topics

    • Funny
My approach to everyone is that there looks to...
Replies
8
Views
2K
Was thinking of just ringing round any ladder...
Replies
12
Views
227
  • Locked
Mate, all you need to do is everything, to...
Replies
10
Views
5K
  • Locked
If the job was that bad, why was it not capped...