If chasing a condensate pipe in to the wall, and then exiting the building so needs to be 32mm pipe. Because.the 22mm pipe is in a chase.when it exits the building in to a 32mm elbow. Part of the elbow will be in the wall. I am concerned as you would never know if.it started to leak. Any one got any thougts on this?