Hi all. New to this. I Will Try and explain best I can.
Large New build (2.5yrs old) with block and beam flooring.
Then Membrane
Then celotex
Then membrane
Wet system underfloor heating
In approx 2-3” of screed I think
Then tiled throughout
15mm Hot and cold copper pipes, felt lagged running from the boiler through the kitchen through the hallway then to a downstairs WC. Approx 15 mtr away from the boiler

Should they be sitting on top the block and beam or on top of the first membrane /DPC ?

Is there a right and wrong approach
Are there building regs for this ?
 
ideally should be above dpc
 

Similar plumbing topics

Thanks, I shall take a look in that case and...
Replies
21
Views
3K
Bit late to the party on this one:p:p
2
Replies
27
Views
4K
R
  • Locked
Contract your own local council building...
Replies
5
Views
1K
R
  • Locked
Hope u didn't pay for that design I've been...
Replies
7
Views
897
Ermintrude
E
Back
Top