M
Mike P
Hi All,
I am doing my first plumbing job for a friend and it involves the following:
- cloak room: Change a toilet and add in a wash basin with the pipes running under the floor boards. (have to find a hot pipe from somewhere.)
- Bathroom: Replace the bath, replace the wash bash and add in isolator valves, add in a shower unit into the wall.
So how much sould I charge for this work and how long would it take a normal plumber to do this job?
Any advice would be great?
Thanks
Mike
I am doing my first plumbing job for a friend and it involves the following:
- cloak room: Change a toilet and add in a wash basin with the pipes running under the floor boards. (have to find a hot pipe from somewhere.)
- Bathroom: Replace the bath, replace the wash bash and add in isolator valves, add in a shower unit into the wall.
So how much sould I charge for this work and how long would it take a normal plumber to do this job?
Any advice would be great?
Thanks
Mike