Hi everyone,
How do you know if there is a cross over with the pluming system in flat? All pipe work under sink, bathroom etc in the flat itself are legit but the rising main is in the attic, there is one rising main pipe (22mm) which has two pipes teed onto it that deliver water to three flats.
Can rerouting of pipes which connect to rising main cause any issues to this. (Can pipes which tee off the rising mains and deliver to three flats-cause any issues with cross over and how can it be avoided), thank you for any info.
Any links to schematic drawings I can see of this if possible so I know what it should look like
How do you know if there is a cross over with the pluming system in flat? All pipe work under sink, bathroom etc in the flat itself are legit but the rising main is in the attic, there is one rising main pipe (22mm) which has two pipes teed onto it that deliver water to three flats.
Can rerouting of pipes which connect to rising main cause any issues to this. (Can pipes which tee off the rising mains and deliver to three flats-cause any issues with cross over and how can it be avoided), thank you for any info.
Any links to schematic drawings I can see of this if possible so I know what it should look like