I hope this is OK to post here, i have a problem with a plumber and want some advice from other plumbers on how to deal with it fairly, long story......
I had my bathroom gutted, re-tiled new shower, bath, new window etc (i supplied all apart from window). We wanted an existing window removed and blocked up and another existing window changed from a crittel one to a timber one. In November last year got a guy in he said job would take 2-3 weeks and would be £4600, he could start straight away.
So he started, Nov last year. About 2 weeks in he said it was going to take a bit longer (more expensive) than quoted time but not sure how much longer and would let me know. He ended up working for 2 more weeks and worked until xmas eve. He left and said he would be back in the new year to complete the job. At this point i paid £4000.
He came back in the New Year to do a couple of little jobs and then disappeared. At this point virtually all of the inside had been done (i had to re-grout the floor as just after he had grouted it and it was still wet he cut the bottom off the wooded bathroom door and all the bits/dust went every where and stuck in the wet grout)
At this point virtually all the inside was done, however on the outside where the old window had been removed it had been bricked up with 1 layer of breeze blocks, internally. But it needed the exterior layer done, this was left exposed. Also, around the new timber window was a 1/4 gap that had not been sealed/filleted and this was letting water in onto the fresh plaster inside.
I contacted him several times to get him to finish he promised he would, but never turned up.
Anyway, 3 weeks ago he turned up at my house to say he had a spare day and had come to finish, 7 months after he started. In the meantime i have paid another chap to finish external bricking, rendering, painting and sealing timber window.
This plumber has now sent me an invoice for £2100, £600 for the remainder of the original quote and £1500 for extra time it took.
What are your thoughts on how i should deal with this?
I had my bathroom gutted, re-tiled new shower, bath, new window etc (i supplied all apart from window). We wanted an existing window removed and blocked up and another existing window changed from a crittel one to a timber one. In November last year got a guy in he said job would take 2-3 weeks and would be £4600, he could start straight away.
So he started, Nov last year. About 2 weeks in he said it was going to take a bit longer (more expensive) than quoted time but not sure how much longer and would let me know. He ended up working for 2 more weeks and worked until xmas eve. He left and said he would be back in the new year to complete the job. At this point i paid £4000.
He came back in the New Year to do a couple of little jobs and then disappeared. At this point virtually all of the inside had been done (i had to re-grout the floor as just after he had grouted it and it was still wet he cut the bottom off the wooded bathroom door and all the bits/dust went every where and stuck in the wet grout)
At this point virtually all the inside was done, however on the outside where the old window had been removed it had been bricked up with 1 layer of breeze blocks, internally. But it needed the exterior layer done, this was left exposed. Also, around the new timber window was a 1/4 gap that had not been sealed/filleted and this was letting water in onto the fresh plaster inside.
I contacted him several times to get him to finish he promised he would, but never turned up.
Anyway, 3 weeks ago he turned up at my house to say he had a spare day and had come to finish, 7 months after he started. In the meantime i have paid another chap to finish external bricking, rendering, painting and sealing timber window.
This plumber has now sent me an invoice for £2100, £600 for the remainder of the original quote and £1500 for extra time it took.
What are your thoughts on how i should deal with this?