I'm going to be installing a new shower. I have a combi. I won't be able to feed 2 showers from a single combi so I going to be adding a second combi just for this shower. I have reasonable pressure (6 bar) and flow rate of 16/l.min. In order to feed these combi's operating simultaneously, I need to ensure sufficient flow to each one.
Q. Do I have a single pressurised cold water tank that has 2 take-offs
Do I have 2 x pressurised tanks (for each combi)
Would an unpressurised tank suffice or will it absolutely need to be pressurised?
Is there another way?
Q. Do I have a single pressurised cold water tank that has 2 take-offs
Do I have 2 x pressurised tanks (for each combi)
Would an unpressurised tank suffice or will it absolutely need to be pressurised?
Is there another way?