DIY manifold with PEX and plumbing a bathroom | General DIY Plumbing Forum | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss DIY manifold with PEX and plumbing a bathroom in the General DIY Plumbing Forum area at Plumbers Forums

Messages
5
Hello all, my wife and I have recently purchased a house in Edinburgh (move in date 6th dec hopefully) and I have been working hard to get a plan done for a diy manifold and I shall do a complete refit of the bathroom. I plan to do it all myself bar the electrics and boiler connections. The floor is 2m x 2m.

The boiler is a combination boiler but unsure if it is a condensing type or not. It is around 10 years old as informed from the owner. Don't have a pic or access unfortunately till the 6th. Located on the ground floor and serves the ground floor kitchen, 1st floor bathroom and the radiators on both of those floors. I plan to do the bathroom to begin with and want to put in underfloor heating along with a towel radiator on the hot water line so it runs all year round. Im getting a bit confused with the towel rad and UFH, will i need a 4 way mixing valve on both the towel rad and UFH, im sure there is a better way.

It not complete yet but I have attached a PDF with lots of drawing and sizes etc and was just hoping for some feedback. It is missing the electrics, central heating and drainage so far. Lots of pipes to move to correct location!

Page 1: is the most important for me to get correct, it will help the rest fall into place. All the 3d parts are just rough.

Is the filling loop usually just a valve kept in the off position or should it be something else?

Are the expansion tanks locations correct in the drawing? I dont know if there is an expansion tank inside the boiler or not, will have to wait and see.

Page 2: I am interested in making the manifold system which is constructed from 22mm copper leading onto pex connections for all pipework throughout the home. 22mm for DW, WM shower and hoses. 15mm for the rest, including central heating. Have put a shutoff valve and drainage for each line.

Page 3, 4 and 5:
general idea of plumbing in 3d.

Page 6: wetroom floor cross section, shows the layers of ply, Ditra membrane and adhesives. Is my porcelain tile adhesive a good choice, going to grab it from Stax for a better deal!

Page 7:
Im going to go through studs as much as possible with piping but sometimes will need to go through the joists. Want to check my locations are ok.

Thanks for reading and will try to reply asap but have a needy toddler in the house to look after!
 

Attachments

  • plumbing.pdf
    1 MB · Views: 57
Page 1
You seem to have a connection between the DHW and the Towel Rail and another connection between the DHW and UFH.?

What's the purpose of the loops at the Hot manifold and the cold manifold, they could end up being dead legs.?
You seem to have an expansion vessel on the mains cold to the DHW HEX and another on the Hot after?
 
Page 1
You seem to have a connection between the DHW and the Towel Rail and another connection between the DHW and UFH.?

What's the purpose of the loops at the Hot manifold and the cold manifold, they could end up being dead legs.?
You seem to have an expansion vessel on the mains cold to the DHW HEX and another on the Hot after?

Hi snowhead, thanks for your reply.

That is a very good point, i shall move the Towel Rad and UFH over to the central heating line, baby brain. I thought that since the radiators will be running alot hotter than the UFH it would go on the DHW line.

The loops were the idea of having a even pressure to each of the lines, was using this manifold idea.
[automerge]1575228820[/automerge]
Ok, so we have an updated schematic on page 1 for the UFH and Towel Rad on the central heating line.

Removed the second expansion tank and rearranged things.

Anyone spot anything wrong with the system or is it looking ok?

Thanks
 

Attachments

  • plumbing.pdf
    1 MB · Views: 45
Last edited:
First off, that is an absolutely gorgeous diagram and visualizations. No room for imagination there--perfect!

As for the Ardex bonding adhesive, you might want to consider the similar Schluter product since you are putting Ditra down. If you use all the correct Schulter products you get the Schulter lifetime warranty. You can check out the warranty details here.

Since this is a PEX system you also might want to include PEX maintenance loops for your hose bibb runs. You can see what I’m talking about here.

We haven’t encountered UFH or a towel rad this far south. I’ll definitely follow this thread to learn more.

Please let me know if you have any questions about these suggestions.
 
Oh I love the PEX maintenance loops, what a super idea, thank you justneedspaint!

And thank you kindly, I try my best.

I have tried to find the Schulter adhesive for a reasonable price, but I can't bring myself to pay for it and have to wait for delivery, seem to only be import and i don't trust ebay sellers.
 

Similar plumbing topics

  • Question
No bathrooms booked for next year, yet. Lots...
Replies
6
Views
1K
  • Question
Yours is an old fotic cylinder, Thermal store...
Replies
1
Views
976
  • Question
We currently have the ground floor wet UFH and...
Replies
0
Views
826
  • Question
Awesome, thanks for all the advise
Replies
8
Views
1K
  • Question
@ShaunCorbs - thanks for the reply - much...
Replies
2
Views
1K
Back
Top