C
chester8
I am currently having my bathroom refitted with new copper pipe work being installed. The plumber has chased the copper pipe work up the walls but has not put a sleeve or meshing over the pipes before plastering over. Is this ok? I would assume that the hot water pipes would need to expand with the heat and surely the plaster will stop it from doing so? Also, will the plaster carode the copper in the future if the pipe is not covered?
Any advice would be appreciated so I can go back to the plumber with the right knowledge before he comes back to finish the bathroom.
Any advice would be appreciated so I can go back to the plumber with the right knowledge before he comes back to finish the bathroom.