Muscle750
Well its been 3 months now and still on going to a point, You may remember we had an extension done with a plumber been subbed by the builder the builder in his quote quoted £820 for plumbing and materials after all the probs ive had which in the end resulted in me having to go throu my house insurance to remove the rubble they had let go down the stench pipe resulting in raw sewage backing up and coming up throu the floor downstairs. In november the plumber submitted a invoice for nearly £1300 i told him basically when he got something sensable to say to come back and i wasnt paying it, and i asked to see all the invoices for the materials he has just this week given me the invoices I have approx 13 pages of materials listed copies of the invoices from the suppilers etc
still adding up to around £1250 with his labour. I had to have the tiles replaced in the new bathroom already as they cracked the shower still turns itself on every now and then and ive still got a hole cut in the new paneling in the bathroom where they had to replace the dergo valve.
You may remember he ran the sink waste up hill on a 8ft run under the floor straight into the stench pipe instead of out throu the wall the sink was mounted on. and he put a load of plastic pipe straight off the bottom of the boiler which he said was only temporary to check the pressure which to me as it took him a day to build this what can only be described as a abortion of a job to me is total rubbish and he was hoping i didnt notice it. All the rubble down the stench pipe and the sink waste i have pics of. Ive offered to pay him the £820 which he doesnt want and says hes owed the invoice. Plus the builder who removed the tiles and put new ones down has used totally the wrong colour grout and it looks nothing short of bloody awfull as ive half the bathroom in one colour and the other half in another!!!!
Im going to call a meeting between the builder plumber and myself this week and sort this out once and for all. Any suggestions on what route i would take plus im obviously going to ask whose paying my £200 excess on my house insurance?
still adding up to around £1250 with his labour. I had to have the tiles replaced in the new bathroom already as they cracked the shower still turns itself on every now and then and ive still got a hole cut in the new paneling in the bathroom where they had to replace the dergo valve.
You may remember he ran the sink waste up hill on a 8ft run under the floor straight into the stench pipe instead of out throu the wall the sink was mounted on. and he put a load of plastic pipe straight off the bottom of the boiler which he said was only temporary to check the pressure which to me as it took him a day to build this what can only be described as a abortion of a job to me is total rubbish and he was hoping i didnt notice it. All the rubble down the stench pipe and the sink waste i have pics of. Ive offered to pay him the £820 which he doesnt want and says hes owed the invoice. Plus the builder who removed the tiles and put new ones down has used totally the wrong colour grout and it looks nothing short of bloody awfull as ive half the bathroom in one colour and the other half in another!!!!
Im going to call a meeting between the builder plumber and myself this week and sort this out once and for all. Any suggestions on what route i would take plus im obviously going to ask whose paying my £200 excess on my house insurance?