Hi all,
current job to replace old lead incoming mains for 25mm poly pipe, from the meter in front garden to kitchen at back of house, 3 bed semi with a combi boiler,
!question! do I need to include a double check valve on the incoming mains water valve arrangement.
many thanks
current job to replace old lead incoming mains for 25mm poly pipe, from the meter in front garden to kitchen at back of house, 3 bed semi with a combi boiler,
!question! do I need to include a double check valve on the incoming mains water valve arrangement.
many thanks